1. 1Preliminary Information
  2. 2Project Details
  3. 3Confirm and Submit

For the Final Acceptance Inspection to be scheduled, is the

* CONTROL # AND COPY OF UPDATED PERMIT ARE REQUIRED IN ORDER TO SCHEDULE AN ACCEPTANCE INSPECTION. APPROVED LAYOUT DRAWING(S) AND TECHNICAL SECTION MUST BE ON JOB SITE.

* CONTROL # is on the top right corner of F150 Elevator Subcode Technical section and is DIFFERENT from the permit number.